top of page


Early Loading of ALX-BT Implants in Different Bone Densities
Patient Information 64years, Female Medical History: Healthy Diagnosis: #36, #37 healed edentulous site (Extraction- March 2026) Treatment plan: -#36, #37 ALX-BT implant placement -Undersize drilling protocol -Early loading of Splinted full Zirconia crown implant Case Summary 🔎 A 64-year-old healthy female presented with healed edentulous sites at #36 and #37 following extraction in March 2026. ALX-BT implants (Ø4.5 neck / Ø5.0 body × 10 mm) were placed using an undersize d
GAO
2 days ago2 min read


Early Loading of an ALX-BT Implant in Soft Posterior Maxillary Bone
Patient Information 65-year-old female Medical History: Healthy Diagnosis: #27 healed edentulous site (Extraction 16/1/2026) Treatment Plan #27 ALX-BT implant placement Undersize drilling & Sinus floor preparation for bicortical stability Early loading of single full metal crown implant Case Summary 🔎 This case presents the placement and early loading of an ALX-BT implant in the #27 region of a 65-year-old female patient, four months after tooth extraction. The posterior
GAO
Aug 313 min read


Final Restoration 10 Days After ALX-BT Implant Placement
Case Summary 🔎 Patient Information Age / Sex: 53-year-old female Medical History: Healthy Diagnosis: #46 healed edntulos site Treatment plan: 1) #46 ALX-BT implant placement 2) Early loading of single crown implant 1️⃣Pre-op Preoperative panoramic radiograph showing the healed edentulous site at #46. 2️⃣Surgery #46 healed edentulous site, with mild concavity & limited keratinized tissue of buccal gingival tissue. CMI Bone densities & Drilling bursteps: - #46 (D233): D2
GAO
Aug 101 min read


Full-Arch Rehabilitation Using Multi-Unit Abutments and Same-Day Provisionalization
Case Summary 🔎 Patient Information Age / Sex: 50-year-old female Medical History: No relevant systemic disease Chief Complaint: “My overall dental condition is poor.” Clinical Diagnosis: Generalized severe periodontitis affecting the remaining maxillary and mandibular teeth Case Summary All remaining maxillary teeth were extracted, followed by surgical guide-assisted placement of six implants. Multi-unit abutments were connected, and a 3D-printed resin provisional prosthes
GAO
Jul 202 min read


Predictable Stability in Limited Vertical Bone Height: ALX-IT Short Clinical Case
Case Summary 🔎 Patient Information 59-year-old male Medical History : Coronary artery disease (coronary stent placement in approximately 2012), Type 2 diabetes mellitus Current Medication: Aspirin, antidiabetic medication(s) Diagnosis #46 : Peri-implantitis associated with severe peri-implant bone loss and inflamed peri-implant soft tissue #47 : Advanced periodontitis with severe alveolar bone loss and Grade III mobility Treatment Plan Explantation of failed implant #46 and
GAO
Jul 102 min read


Immediate Placement of an ALX-BT Narrow Implant in the Maxillary Anterior Region
Case Summary 🔎 Patient Information 79y, Male Medical history : Hypertension, Hyperlipidemia, Allergy to Aspirin Diagnosis #22 Zirconia Crown fracture Treatment Plan Atraumatic tooth extraction #22 Osteotomy preparation (Ø2.5 mm single drilling) Placement of a 3.5 × 10 mm ALX-BT Narrow implant with bone grafting Intraoral digital scan for prosthetic impression (7 weeks) Delivery of the final restoration (8 weeks) Case Overview This case presents the immediate placement of a
GAO
Jul 22 min read


Immediate Placement of ALX-BT Implants in Mandibular Posterior Extraction Sockets
Case Summary 🔎 Patient Information 92y, Female Medical history : Hypertension, Hyperlipidemia, Osteoporosis Diagnosis Chronic periodontitis involving teeth #35 and #36 Hopeless prognosis of #35 and #36 due to periodontal involvement Alveolar bone defect associated with chronic periodontal disease Treatment Plan Atraumatic extraction of #35 and #36 Immediate implant placement at both extraction sockets Fixture placement: ALXBT 5008 at both sites Bone grafting Case Overview
GAO
Jun 122 min read


Predictable Torque in D1 Hard Bone: Same-Day #36 Re-placement Using ALX-BT
Case Summary 🔎 Patient Information 55 y/o, Male Past Medical History: Gout (on medication) Diagnosis : Peri-implantitis around #36 implant Treatment Plan : Same-day fixture removal and immediate placement of ALX-BT 6008 Introduction Peri-implantitis has become a major challenge in implant dentistry, frequently necessitating fixture removal. While immediate, same-day re-placement offers significant advantages in reducing overall treatment time, performing this procedure in D1
GAO
May 212 min read


Early Loading of ALX-BT Implant in the Maxillary Posterior Region: 2-Week Loading
Case Summary 🔎 Patient Information 78 y/o, Male Past Medical History: Hyperlipidemia Introduction This case presents the placement of an ALX-BT bone level implant in the #16 region of a 78-year-old male patient. The posterior maxilla exhibited poor bone quality (D443), which is typically associated with challenges in achieving sufficient primary stability for early loading. Utilizing the ALX-BT implant, featuring an aggressive thread design and a narrow core, high primary st
GAO
May 61 min read


From Fixture Removal to ALX Same-Day Placement Using an All-in-One Remover Kit
Case Summary 🔎 Patient Information Patient : 72-year-old female Medical history : Non-contributory Implant history : Implant placed in 2013 Diagnosis : #47 Implantitis Treatment plan : Fixture removal → Diameter 6.5 ALX-IT same-day placement Case description This case shows that stable primary stability is achievable with ALX implants even in a compromised site after fixture removal. By using the All-in-One Remover Kit, damage to the surrounding bone is minimized. Despite li
GAO
Dec 16, 20252 min read


Immediate Placement and 4-Week Loading at #45 with the ALX Implant and Kit Protocol
Case Summary 🔎 Patient Information 38 y/o, Male Past Medical History: Healthy Introduction A 38-year-old male patient underwent extraction of the retained primary tooth (#85), followed by immediate placement of an ALX implant. An intraoral scan was performed on the day of extraction and implant placement. The implant achieved favorable primary stability with a high IST value, allowing delivery of the definitive prosthesis after only one month. The final restoration was fabri
GAO
Dec 5, 20252 min read


ALX Implant Placement with Lateral Sinus Approach in the Maxillary Posterior Area
Case Summary 🔎 Patient Information •Age/Gender: 77-year-old, Male •Past Medical History: None •Dental History: Previously restored maxillary left posterior area with bridge; abutment teeth showed mobility and periodontal deterioration •Drug allergy: None •Chief complaint: “I want to replace the unstable bridge and regain comfortable chewing.” Introduction Implant rehabilitation in the maxillary posterior region can be challenging due to limited residual bone height, especial
GAO
Nov 28, 20254 min read


Delayed re-implantation using ALX and Prosthetic restoration with CL-Link
Case Summary 🔎 Patient Information 73 y/o, Male Past Medical History: Healthy Introduction This case report describes the delayed re-implantation of a mandibular posterior site using the ALX implant system, followed by digital prosthetic restoration with the CL-Link system. The patient presented with peri-implant bone loss around the distal implant of a mandibular implant-supported bridge. The compromised implant was removed, and bone grafting was performed. After an appropr
GAO
Nov 7, 20252 min read


Re-implantation of Failing Implants Using ALX System and Final Restoration with CL-Link
Case Summary 🔎 Patient Information 77 y/o, Female Past Medical History: Osteoporosis (taking oral medication once a week) Dental History: Multiple implants previously placed on both arches; recurrent peri-implantitis and bone loss noted around maxillary left posterior implants C.C.: “I feel discomfort and swelling around the upper left implants” Diagnosis: Peri-implantitis with severe bone defect in the maxillary left posterior area (#25–27) Introduction A 77-year-old female
GAO
Oct 28, 20253 min read


Immediate placement and 1-week loading of 7 mm wide ALX-IT implant in compromised molar site
Case Summary 🔎 Introduction Immediate placement of a 7mm diameter ALX-IT implant in a compromised mandibular molar site A mandibular right first molar (#36) with chronic periodontitis and a deep pocket was extracted. The septum bone was flattened using the IP (Immediate Placement) drill from the VaroGuide kit, followed by final drilling with a Ø5mm drill. A Ø7mm diameter ALX-IT implant (27008) was placed, featuring a 5mm core and 1mm deep threads, enabling stable fixation ev
GAO
Oct 22, 20252 min read


Full-Arch Rehabilitation using ALX-IT implants
Case Summary 🔎 Patient Information 56 y/o, Female Past Medical History: No systemic disease reported Dental History: Remaining teeth...
GAO
Sep 30, 20253 min read


ALX Re-implantation after Explantation of Implant with Peri-implantitis
Case Summary 🔎 Patient Information Age/Sex: 80-year-old Male Systemic Condition: Medically healthy Clinical Findings Tooth Site: #15...
GAO
Sep 22, 20252 min read


Management of a Severely Resorbed Ridge using ALX Implant
Case Summary 🔎 Patient Information Past Medical History: History of Diabetes under medication Drug allergy: None Introduction The...
GAO
Sep 10, 20253 min read


One-Month Loading following Immediate Implant Placement with ALX Implant
Case Summary 🔎 Patient Information Past Medical History: None Drug allergy: None Introduction Immediate implant placement after...
GAO
Aug 29, 20252 min read


Successful ALX Implant Placement with Cementless Link in the Maxillary Anterior
Case Presentation 0️⃣ Diagnosis & Treatment Plan Patient Information Age/Sex : 78-year-old male Reason for Visit : Routine dental...
GAO
Aug 19, 20252 min read
bottom of page